One second vector and scalar magnetic measurements at the low-latitude Choutuppal (CPL) magnetic observatory

Nelapatla Phani Chandrasekhar, Sai Vijay Kumar Potharaju, Kusumita Arora, Chandra Shakar Rao Kasuba, Leonid Rakhlin, Sergey Tymoshyn, Laszlo Merenyi, Anusha Chilukuri, Jayashree Bulusu, and Sergey Khomutov

Abstract. One second measurements of the geomagnetic field variations, which meet INTERMAGNET quality and transmission specifications, require very special conditions to be maintained at the observatories over sustained periods of time, which pose serious challenges for the operators, particularly when infrastructural and environmental conditions are far from ideal. This work presents the progressive steps, which led to the successful setup of such measurements at the new magnetic observatory of the Council of Scientific and Industrial Research (CSIR)-National Geophysical Research Institute (NGRI) in the Choutuppal (CPL) campus, Hyderabad (HYB), India. The 1 s magnetic measurements in trial mode commenced in 2015 using the newly developed observatory-grade 1 s fluxgate magnetometer, GEOMAG-02MO, from Research Centre GEOMAGNET (GM), Ukraine, and the Overhauser proton precession magnetometer, GSM-90F1, along with the data acquisition system, Magrec-4B from Mingeo, Hungary. Iterative tuning of the setup led to the generation of good quality data from 2016 onward. The processes of commissioning this setup in low-latitude conditions, with the aim of producing 1 s definitive data, and the characteristics of the data from this new instrument are presented here.

Download
Short summary
This work presents the progressive steps which led to the successful setup of such measurements at the new magnetic observatory in Choutuppal (CPL) of CSIR-NGRI, Hyderabad, India. Iterative tuning of the setup led to the generation of good quality data from 2016 onward. The processes of commissioning this setup in low-latitude conditions, with the aim of producing 1 s definitive data, and the characteristics of the data from this new instrument are presented here.